OIG Releases Audit of CDOT’s Management of Construction in the Public Way

A report released today by the City of Chicago Office of Inspector General (OIG) found that the Chicago Department of Transportation’s (CDOT) management of construction projects in the public way has saved the City money but still has room for improvement. OIG’s audit determined that CDOT did not fully maximize public way project coordination opportunities to protect its infrastructure and minimize disruptions and did not ensure that permittees restored street surfaces in accordance with its rules and regulations.

OIG acknowledged that CDOT’s project coordination program reduced unnecessary street cuts and saved the City at least $18.1 million in 2016. However, OIG identified several areas for further improvement of the program, which we encourage CDOT to pursue. Specifically, CDOT is currently inspecting only a fraction of street restorations required by the Municipal Code. Furthermore, CDOT relies almost entirely on 311 complaints to identify street cut restoration problems, which may give rise to inequitable enforcement by favoring parts of the City where residents demonstrate a greater propensity to file complaints. “This audit demonstrates how private/public infrastructure coordination has yielded significant benefits for the City, utility companies, and the general public. The currents administration’s commitment to this type of coordination has allowed the City to begin saving millions annually, but millions more in low-hanging fruit remains. We encourage the City to support CDOT as the Department makes further improvements to ensure streets are restored to the City’s standards,” says Joseph Ferguson, the Inspector General.

OIG recommended:

  • More robust coordination with stakeholder agencies, including the Department of Water Management
  • Involving the Public Building Commission and the Department of Planning and Development in project coordination efforts
  • Removing core infrastructure from the Aldermanic Menu Program and centralizing infrastructure planning in order to maximize longterm coordination opportunities
  • Implementing procedures to ensure that contractors are no longer able to use emergency dig tickets as a way of circumventing the coordination program
  • Developing a strategy to inspect all public way restorations as mandated by the Municipal Code, to include random risk-based restoration inspections and a staff analysis to determine how many additional inspectors are necessary
  • Replacing the paperbased inspection and citation record system with an electronic system

CDOT agreed with every OIG recommendation except the removal of core infrastructure from the Aldermanic Menu Program. “Indeed, this is the latest in a series of audits that highlights significant benefits that would be realized by the City, its residents, and its taxpayers by seizing targeted investment in personnel and taking a holistic approach to core infrastructure under CDOT,” says the Inspector General.

The full report can be found online.

Follow @ChicagoOIG on Twitter for the latest information on how OIG continues to fight waste, fraud, abuse, and inefficiency in Chicago government.

###